1 kVA Solar hybrid power plant
Yield expectation
In a sunny day, this solar power plant can supply around 3.24 kWh in eastern Africa per day. Enough to cover the energy consumption of many households.
An example calculation of energy consumption for 1 kVA solar power plant is show in the table below: The operation time of the appliance could be for example from 6 PM to midnight for all of the devices expect the fridge. The fridge can run during the whole day to keep the food cool.
All household appliances, which are available in the market (like refrigerator, lightning, fan, TV, PC and more), can be operated with this solar hybrid PV power design
Design of the PV power plant
This solar power system is designed for independent power supply and hybrid application. It can be operate as a stand-alone power supply system. As required, it is possible to connect a generator for hybrid application.
If the power supply from the photovoltaic (PV) panels is insufficient, the PV system automatically supplements the missing power from the battery storage. At night or at complete breakdown of the PV panels and empty battery storage, the PV system automatically switches off to protect the lifetime of the battery storage. The system switches automatically to PV supply as soon as the sunrise
Scope of delivery
Solar Inverter
1 x Hybrid Inverter / Charger Type 1000-12
1000 W pure sinus Inverter
Output Frequency: 50Hz
Output voltage: 230 V
Integrated battery charger 50 A / 12 V
Automatic system switch OFF when no sun and empty storage
Automatic System switch ON when sunrise or storage is available
Solar Panels
600 Wp (3 x Solar Panels 200 Wp or equivalent to 600W)
Power class 150 to 235 Wp
Designed service lifetime >20 years
Battery Supply
2 x Gel Battery Deep Cycle Series
Storage Capacity 4.8 kWh @100% DOD (deep of discharge)
Recommended DOD @50% 2.4 kWh
Designed service lifetime 10 year
Dimensions: L 518 mm x W 276 mm x H 242 mm
Power: 12 V / Capacity: 200 Ah
Weight: 60.00 Kg
Installation and Commissioning
Commissioning and pretest will applied immediately after installation. It may require some test runs before release for regular operation. All required adjustments and electrical connections including cables are part of the commissioning